Beralih ke bagian utama Beralih ke menu navigasi utama Beralih ke bagian footer website
Jurnal Inovasi Konstruksi
  • Current
  • Archives
  • Announcements
  • About
    • About the Journal
    • Submissions
    • Editorial Masthead
    • Contact
Cari
  • Register
  • Login
  1. Beranda /
  2. Arsip /
  3. Vol 4 No 1 (2025): April

Vol 4 No 1 (2025): April

His issue has been available online since April, 30th 2025. All articles in this issue (5 original research articles) were authored/co-authors from 1 country (Indonesia)
DOI: https://doi.org/10.56911/jik.v4i1
Diterbitkan: 2025-04-30

Artikel

  • PRODUKTIVITAS TENAGA KERJA PROYEK THE DEVELOPMENT AND UPGRADING OF THE STATE UNIVERSITY OF JAKARTA (PHASE 2) CIVIL WORKS (Studi Kasus Pekerjaan Pemasangan Dinding Bata Ringan)

    Muhammad Zidane Imadudine, Muhamad Rasyid Wahyu Saputra, Yudha Pracastino Heston, Rizky Citra Islami
    1-10
    • PDF (Inggris)
  • DISCONTINUITY AND SLOPE STABILITY ANALYSIS BASED ON GEOLOGY STUDY AND RESISTIVITY GEOELECTRIC MEASUREMENT

    Aris Rinaldi, S Situmorang, A A Valencia
    11-15
    • PDF (Inggris)
  • METODE PELAKSANAAN PEKERJAAN STRUKTUR CORE WALL DENGAN SISTEM CLIMBING FORMWORK PADA PROYEK OFFICE TOWER BNI DI KAWASAN PANTAI INDAH KAPUK 2, TANGERANG

    Muadz Abdur Rahman Harits, Sayed Ahmad Fauzan
    16-22
    • PDF (Inggris)
  • KOLABORASI PEMERINTAH PUSAT DAN PEMERINTAH DAERAH PADA KEGIATAN PENINGKATAN KUALITAS KAWASAN PERMUKIMAN KUMUH SEBAGAI UPAYA PEMBANGUNAN BERKELANJUTAN (STUDI KASUS: KAWASAN KUMUH PULAU PENYENGAT, KOTA TANJUNGPINANG)

    Fikrian Rafika Dewi, Sunarto Sunarto
    23-33
    • PDF (Inggris)
  • IMPLEMENTASI BUILDING INFORMATION MODELING PADA PROYEK PEMBANGUNAN GEDUNG JAKSA AGUNG MUDA BIDANG TINDAK PIDANA KHUSUS

    Raden Herdian Bayu Ash Shiddiq, Gina Yuniar
    34-42
    • PDF (Inggris)
Informasi lengkap tentang sistem publikasi, Platform dan Alur Kerja oleh OJS/PKP.